IRAQ - DESIGN AND CONSTRUCTION OF SULAIMANIYAH INTERNATIONAL AIRPORT AND TERMINAL BUILDING DESIGN AND BUILD TURN KEY PROJECT, (2004-2005)
SULAIMANI INTERNATIONAL AIRPORT PROJECT DESCRIPTION:
A- INFRASTRUCTURE WORKS:
- CONSTRUCTION OF A NEW RUNWAY OF 3,500m LONG and 45m WIDE
TOGETHER WITH 7.5m CONCRETE PAVED SHOULDERS+ 45m WIDTH:
A1- COMPACTED EARTH SHOULDERS ON EACH SIDES + 60m x 60m - CONCRETE PAVED CLEAR ZONES ON EACH END OF THE RUNWAY WITH ALL INFRASTRUCTURE FACILITIES.
- CONSTRUCTION OF TWO CONNECTION TAXI TRACKS AND TWO HIGH SPEEDTAXI TRACKS ACCORDING TO THE DRAWINGS AND INTERNATIONAL STANDARDS MENTIONED IN TECHNICAL DOCUMENTATIONS WITH ALL INFRASTRUCTURE WORKS.
- CONSTRUCTION OF PARALLEL TAXIWAY of 3,500m LONG AND 35cm BASE AND 40cm QUALITY PAVEMENT CONCRETING OF EXISTING 30m WIDE RUNWAY+ 3m CONCRETED PAVED SHOULDERS+ 12m WIDTH COMPACTED EARTH SHOULDERS ON EACH SIDE WITH ALL INFRASTRUCTURE FACILITIES.
- CONSTRUCTION OF A NEW APRON WITH 40cm QUALITY PAVEMENT
CONCRETING ACCORDING TO THE DRAWINGS.
B- SUPERSTRUCTURE WORKS:
(With all furniture, computer and telephone systems and all other necessary equipment (kitchen, etc) included, Turn-Key basis)
- CONSTRUCTION OF THE INTERNATIONAL TERMINAL BUILDING OF 1,600,000 PASSENGERSNEAR CAPACITY WITH ALL FACILITIES
- CONSTRUCTION OF CONTROL TOWER OF 31 METERS HIGHT
- AIRPORT MAIN ENTRANCE BUILDING
- TECHNICAL AND ADMINISTRATION BUILDING
- ACCIDENT AND FIRE EXTINGUISH BUILDING
- SECURITY BUILDING
- SHED FOR APRON VEHICLES
- GARAGE FOR HEAVY VEHICLES
- POWER SUPPLY BUILDING
- H1 AND H2 REGULATOR BUILDINGS
- PERIPHERIAL SECURITY TOWERS
- CATERING SYSTEM BUILDING
- CARGO FACILITY BUILDING
- METEOROLOGY BUILDING
C- ELECTRICAL WORKS AND ELECTRONICAL SYSTEMS:
RLS - MAIN RUNWAY, TAXIWAY. TAXI TRACKS AND APRON LIGHTING AND SIGNING SYSTEMS ACCORDING TO "ICAO" STANDARDS.
RLS -APPROACH LIGHTING SYSTEM ON EACH TWO ENDS OF RUNWAY ACCORDING TO "ICAO" STANDARDS, "A" TYPE (CAT I)
RLS - MAIN RUNWAY, TAXIWAY, TAXI TRACKS AND APRON LIGHTING AND SIGNING SYSTEMS ACCORDING TO "ICAO" STANDARDS. (ALL INFRASTRUCTURE WORKS ACCORDING CAT II)
- RUNWAY "PAPI"
- APRON ILLUMINATION (4 POLES, 25 METERS, WITH LIFT)
- LIGHTING OF SECURITY ROAD 19 km
- 2*5MVA MAIN (33/11kV) POWER DISTRIBUTION STATION (800kVA+ 2*500kVA - TRANSFORMER AND 800kVA+2*500kVA GENERATORS)
- SUBSTATION TRANSFORMERS (H1 AND H2 REGULATOR BUILDINGS) 2 * 250 KVA AND 2*225 KVA GENERATORS.
- CONTROL CABLES BETWEEN H1, H2 AND CONTROL TOWER
- CONTROL TOWER COMMUNICATION SYSTEM
- VHF/UHF AIR-TERRAIN STABILE WIRELESS SYSTEM
- VHF/UHF AIR-TERRAIN EMERGENCY WIRELESS SYSTEM
- VOICE COMMUNICATION CONTROL SYSTEM (VCS)
- ATIS -AUTOMATED TERMINAL INFORMATION SYSTEM
- AFTN - AERONAUTICAL FIXED TELECOMMUNICATION NETWORK
- VOICE REGISTRATION SYSTEM
- AIR TRAFFIC HELPING SYSTEM
- DVOR/DME SYSTEM - DISTANCE MEASUREMENT EQUIPMENT / DOPPLER OMNI
- DIRECTIONAL RADIO RANGE
- ILS - INSTRUMENT LANDING SYSTEM (Localizer, Glide Path, Marker)
- AIRPORT METEOROLOGICAL SYSTEM (AWOS)
- PERIPHERIAL AND AIR/TERRAIN SEPARATOR SECURITY FENCE ; 19km
- PERIPHERIAL SECURITY ROAD ; 14 km + INNER ROADS ; 3km + ACCESS ROAD; 1,5km
- WATER TANK (400 TONS)
- SEWAGE WATER TREATMENT PLANT (400 m3) AND CONNECTION OF ALL FACILITIES
- FUEL STORAGE TANKS (2 * 250 TONS)
- OPEN PARKING AREAS OF TERMINAL BUILDING AND OTHER BUILDINGS