TURKEY-ISTANBUL, MARMARA TECHNOLOGY RESEARCH CENTER, CONSTRUCTION OF TECHNOLOGY FREE ZONE SERVICE BUILDINGS, GEBZE

Construction of TÜBİTAK MAM Technology Free Zone Service Buildings

 

TÜBİTAK Gebze Campus – Gebze/KOCAELİ

 

- Reinforced concrete + Steel.

- Having 15.000 m2 closed construction area to be composed of  6 blocks.

- Two blocks have been constructed as three storeys, two blocks as four storeys and a block as steel construction and space framework system.

- In the complex; external facade has been formed with special sheet coating, aluminum composite panels, silicone and planer glass facade combination.

- Intermediate storey in 2 blocks was completely constructed as steel construction.

- Reinforcement concrete system was made with conventional framework system.

- Indoors; lifted up flooring on basement, satin+plastic dye on plaster coating on walls and suspended ceiling have been implemented. 

-
The complex was constructed as turn key-delivery including electrical and mechanical systems and a computerized auto-control system was applied in mechanics.